Winlock 2A
Clients
Newtecons
Region
Southern Vietnam
City
Ben Luc, Long An
Budget
Not disclosed
Year Completed
Not disclosed
Size
101,892 m² – 4 warehouses
Sector
Industrial
Sub-Sector
Factory & Logistics Facility
About Project
Winlock 2A is an expansive industrial facility in Ben Luc, Long An, consisting of four warehouses with a total construction area of 101,892 m². Built by Newtecons for BW Industrial, the project is designed to meet modern manufacturing and logistics demands. M-Atlantic supplied a complete range of construction chemical products, including MA DS-R1 formwork release agent, MA BC-W aluminum & gangform release agent, MA CURING S concrete curing compound, and MA PRIMER SL surface primer — ensuring top-quality surface finishes, optimal curing, and long-lasting structural integrity.
Our Client’s Challenge
The contractor required:
Efficient formwork release for both conventional and aluminum formwork systems.
Strong concrete surface protection during the curing stage.
Proper surface preparation for subsequent floor coatings in high-load warehouse environments.
Our Approach And Solution
M-Atlantic delivered:
MA DS-R1 and MA BC-W for flawless formwork release on various formwork types.
MA CURING S to control curing conditions, reduce cracking risks, and improve concrete strength.
MA PRIMER SL to prepare concrete floors for heavy-duty coating applications.
